Thursday, December 27, 2012

Five Truths on BIM

In my experience in using BIM, I have become keenly aware of a number of "truths" in the arena of VDC. That said, I'm heading to the zoo with "my zoo" in tow today so I'll make it a quickie if possible.

Truth 1: The Owner owns the information (model).

If you're under contract to an Owner to design, construct and/or operate a building, they own the models and the information, just as they own the building. Our role as designers, contractors and operators is to be excellent stewards of this data as it passes through a building's informational life cycle and to optimize its use.

Truth 2: More information is not better. The RIGHT information is. 

Take a door for example. The Architect is interested in:
- code compliance
- was it sustainably sourced?
- the doors hourly fire rating
- available finishes
- hardware styles
- security level

As the responsibility for the door passes from design to construction, the information needed by the Architect to make good decisions is not the same information the contractor needs. The contractor needs to know:
- how many of each door there will be?
- does the warranty on the equipment match the specification?
- are there local suppliers?
- what are the costs of the doors?
- what is the availability and delivery schedules?

After the door is installed, the facility manager needs to have a certain level of information to do their work. This (on average) is about 10%-12% of what is aggregated throughout design and construction. Information such as:
- When do I oil the equipment?
- Where do I get replacement hardware?
- How do I program the lockset?
- How do I get to the warranty information?

The faster teams understand that some information is needed for the entire informational life cycle and that some has a shelf life; the faster teams achieve real clarity around how to pass useful information to the next project stakeholder. This eliminates the old way of heaving massive amounts of useless data "over the fence" to other team members to sort through and creates a deeper dialog of coordination in project teams.

Truth 3: Subcontractors should NOT run 3D coordination sessions.

We work with some really good subs and while I am sure that most of those are capable of running clash detection meetings themselves... it is our job as construction managers to own the coordination efforts. This theory is due to a number of reasons and experience, but the main reason is when coordinating with multiple trades it is far easier to have a "third party" unbiased approach to systems routing and configuration.

In my experience, I have found that the sub that runs the meetings rarely moves and has other trades move around them. This is particularly true when the project is in the thick of things and everyone is experiencing a bit of project fatigue. Secondly, on contract delivery vehicles such as CM@R, CM led DB, IPD and even hard bid where the CM's or GC's carry the majority of contractual risk; the majority of risk mitigation efforts should lie with the major risk holder. If a CM isn't doing this they are letting a subcontracted party manage their risk with no reward model and this is never a good decision in any business.

Lastly, relying on subs to run coordination meetings creates inconsistency to these efforts. As most CM and GC firms work with different subs on each project, there is a lot of value in providing consistent deliverables for your internal staff, so they aren't re-learning what a set of deliverables may be for each new project.

Truth 4: Establishing a learning culture is more important than creating BIM standards.

For many organizations, this is a toughie.

As new technologies enter the market on a daily basis, successful firms are finding that there is more value to establishing learning as a priority, rather than standards.

Standards, while useful in some aspects of a coherent look and feel or deliverable process, often become outdated before they are widely adopted. For this reason, I encourage groups to look at how to create "one page guidelines" that allow for flexibility and creativity around a process rather than a 213 page BIM standard on model creation. Creating a guideline allows for new technologies and processes to be inserted into a workflow to optimize output. When you create a standard, the clay has already set and there is little to no room for innovation.

Truth 5: If you aren't engaging your CA or field staff in the process you will lose.

One of the most repeated questions I hear is, "How do we take all of this great stuff we've done in the virtual environment and replicate it in the field?"

I have found that the answer to this question is, engage your field team. The team that is going to be responsible for construction administration, or construction management MUST be plugged in to the process. Otherwise your results are often going to be sub-par. Why is this?

Well, to understand we have to begin thinking like a project superintendent.

Here is a guy or gal who has "x number" of years experience in building structures and now they are being told by some VDC operator how to build their project from what a computer is telling them. Guess what?

There's no buy-in. In this scenario, there is no background being provided on the history to the decisions or directions along the way that could very well have created a solid product (this has to do with Truth #2). Thus the confidence level in that deliverable is zero, nill, nada.

Now think about how valuable it would be to have this same human database of information be able to participate in the coordination process with time tested input and real world experience. I won't give away the ending if this is news to you, but it will change your perspective real fast....also as a heads up this will often be where you will get some of the best ideas your organization has ever had.


That's it for now. I may do a part two, but we are going to go look at some monkeys. Let me know your thoughts and Happy New Years!

7 comments:

Anonymous said...

Truths - agree with your perspective.

Unknown said...

I'm intrigued by the notion of "one page guidelines". I work in a 60+ firm that has historically had problems with maintaining standards. I'm getting ready to embark on the 213 page BIM Standard document. What do the one page guidelines look like?

architect11 said...

Hey Tim -

Great question! I can give you the quick answer and then post an example if that will help in my next blog post.

Basically, one page guidelines identify one workflow and then in one 11x17 sheet identify the following:

- The expectation in deliverable quality
- The value in the workflow
- The best practice for the workflow, we have found this is best accomplished through 10 minute or less camtasia video links.
- Who to talk to if they find a better or more improved way of working in this workflow (most important)

I'll post an example of this in my next post.

Thanks,
Brad

Unknown said...

I would like to read part two. I am a concrete sub and have been using trimble robotic total station since 2007, for survey, layout and checking the surveyor for errors.
Bim is interesting for us in this respect.

Alex Gore said...

Very good points, I especially appreciate Truth 2 and Truth 4.

DrZZ said...

Thanks for this post. For those of you who can read French, this one (http://rhino4you.com/1/bim_ifc_maquette_3d_383350.html) nicely complements it. The BIM community is actually very active in France and continental Europe.